Discovery Sprints
Release Readiness Audit
Pre-launch checklist covering observability, rollback, and operational runbooks.
Before you flip the switch, we verify the operational layer matches the demo — for teams targeting production in the PH region.
₱40,000 · 5 days · Async review
Schedule a call Money-Back PolicyFeatures
- Runbook completeness review
- Rollback drill design
- SLO/SLI draft
- On-call rotation review
- Feature flag strategy check
- Launch comms template
Outcomes
- Go-live gate criteria with owners
- Gap list sorted by launch risk
- Post-launch monitoring plan
FAQ
Staging parity is minimum; production read-only helps for config verification.
Reviews
Release Readiness Audit found our rollback drill was theoretical. We ran a real drill the next week.
Client in health tech — thorough runbook review, though documentation took us longer to fix than expected.
Lead consultant
Preview
Sam Okonkwo
Delivery Manager who has scaled squads from 6 to 40 engineers without adding process theater.
Scale-up · 1–2 weeks