Discovery Sprints

Release Readiness Audit

Pre-launch checklist covering observability, rollback, and operational runbooks.

Before you flip the switch, we verify the operational layer matches the demo — for teams targeting production in the PH region.

₱40,000 · 5 days · Async review

Schedule a call Money-Back Policy

Features

  • Runbook completeness review
  • Rollback drill design
  • SLO/SLI draft
  • On-call rotation review
  • Feature flag strategy check
  • Launch comms template

Outcomes

  • Go-live gate criteria with owners
  • Gap list sorted by launch risk
  • Post-launch monitoring plan

FAQ

Staging parity is minimum; production read-only helps for config verification.

Reviews

Release Readiness Audit found our rollback drill was theoretical. We ran a real drill the next week.

— Elena , Founder · StackRoute PH · 5/5

Client in health tech — thorough runbook review, though documentation took us longer to fix than expected.

— Anonymous
Release Readiness Audit

Lead consultant

Sam Okonkwo
Preview

Sam Okonkwo

Delivery Manager who has scaled squads from 6 to 40 engineers without adding process theater.

Scale-up · 1–2 weeks